Smooth and safe start for skiers:Ski lift modernization – Polomka

Ski-lift drive modernization with UNIFREM 400 132 (132 kW)

Construction period: 2025/2026 | Country: Slovakia

Ski lift modernization – Polomka

Customer challenge

The ski lift with its original switchboard and control needed modernization: a safe, smooth start for skiers and reliable operation in winter conditions.

VONSCH solution - turnkey

VONSCH products supplied
UNIFREM 400
Solution diagram
Scope of delivery (technical specification)
  • Complete renewal of the switchboard and lift control
  • New control with a graphic display
  • Modernization of the main lift drive
  • UNIFREM 400 132 frequency converter (132 kW) with vector control
  • Safety circuits of the lift (safety loop)

Project in numbers

132 kW
UNIFREM 400 132
new
switchboard + control
graphic display
lift control
2025/26
implementation period

What the customer gained

  • Smooth, comfortable start for skiers – no rope jerks when boarding
  • Lower mechanical stress on rope, gears and drive – longer equipment life
  • New control with a graphic display – clear operation and fast diagnostics
  • Complete modernization from a single source: switchboard, control and drive

Why VONSCH

We reduce the risk of a wrong decision - from design to service you deal with a single partner who stands behind the solution.

  • A manufacturer, not a reseller - we develop and build power electronics in Brezno, Slovakia.
  • A turnkey solution - one responsibility from design through installation to commissioning.
  • Service and spare parts from Slovakia throughout the entire lifetime of the equipment.